Production Schedule
Date
|
Location
|
Scenes
|
Crew
|
Props/Equipment
|
1/12/16
|
Lakes and motorway bridge
|
Opening scene/sequence (Pre music audio)
|
Alex, Lorna
|
Cigarettes/ Tripod + camera
|
6/12/16
|
Lorna’s house
|
Alcohol scene, Domestic abuse scene featuring POV worm angle shot.
|
Alex, Lorna, Oliver
|
Alcohol + Bruise makeup + Lorna Outfit/ Tripod + camera
|
12/12/16
|
My house
|
Over shoulder shot of phone, Snake in bath and blood in sink.
|
Alex, Lorna
|
Fake blood + Snake + Red lipstick/ Tripod + camera
|
20/12/16
|
Alex, Lorna
|
|||
31/12/16
|
Alex, Lorna
|
|||
5/01/17
|
||||
10/01/17
|
N/A
|
N/A
|
N/A
|
N/A
|
12/01/17
|
N/A
|
N/A
|
N/A
|
N/A
|
I have set aside two dates in my production schedule in the event that I will need to take re-shoots or simply need extra scenes/footage. In either case I would rather have a preplanned set of days in the event such a need would occur. This allows for me to give my team/crew plenty of enough time and heads up, which in turn will reduce the chances of having a clash of availability and not being able to get the last minute footage that is, perhaps, desperately needed.
No comments:
Post a Comment